In the field of accounting, activity-based costing and traditional costing are two different methods for allocating indirect (overhead) costs to products.
Both methods estimate overhead costs related to production and then assign these costs to products based on a cost-driver rate. The differences are in the accuracy and complexity of the two methods. Traditional costing is more simplistic and less accurate than ABC, and typically assigns overhead costs to products based on an arbitrary average rate. ABC is more complex and more accurate than traditional costing. This method first assigns indirect costs to activities and then assigns the costs to products based on the products’ usage of the activities.

Traditional Costing Method

Traditional costing systems apply indirect costs to products based on a predetermined overhead rate. Unlike ABC, traditional costing systems treat overhead costs as a single pool of indirect costs. Traditional costing is optimal when indirect costs are low compared to direct costs. There are several steps in the traditional costing process, including the following:
1. Identify indirect costs.
2. Estimate indirect costs for the appropriate period (month, quarter, year).
3. Choose a cost-driver with a causal link to the cost (labor hours, machine hours).
4. Estimate an amount for the cost-driver for the appropriate period (labor hours per quarter, etc.).
5. Compute the predetermined overhead rate (see below).
6. Apply overhead to products using the predetermined overhead rate.

Predetermined Overhead Rate Calculation

Use the following formula to calculate predetermined overhead rate:

Predetermined Overhead Rate = Estimated Overhead Costs / Estimated Cost-Driver Amount

For example:

$30/labor hr = $360,000 indirect costs / 12,000 hours of direct labor

Activity-Based Costing Benefits

Activity based costing systems are more accurate than traditional costing systems. This is because they provide a more precise breakdown of indirect costs. However, ABC systems are more complex and more costly to implement. The leap from traditional costing to activity based costing is difficult.

Traditional Costing Advantages and Disadvantages

Traditional costing systems are simpler and easier to implement than ABC systems. However, traditional costing systems are not as accurate as ABC systems. Traditional costing systems can also result in significant under-costing and over-costing.
If you want to add more value to your organization, then click here to download the Know Your Economics Worksheet.
activity based costing vs traditional costing
[box]Strategic CFO Lab Member Extra
Access your Strategic Pricing Model Execution Plan in SCFO Lab. The step-by-step plan to set your prices to maximize profits.
Click here to access your Execution Plan. Not a Lab Member?
Click here to learn more about SCFO Labs[/box]
activity based costing vs traditional costing

ARTICLES YOU MIGHT LIKE

Does your Accounting Department Produce Net Income?

Coaching the Entrepreneur: Learn how to know what you don’t know. How much should I spend on accounting for my company?     I have been in the accounting profession for 32 years, and for the last 6 years, I’ve owned my own consulting firm to assist companies with accounting challenges. There is one common theme that I

Read More »

Mining the Balance Sheet for Working Capital

Mining the Balance Sheet for Working Capital Let’s face it… There has been significant liquidity in the marketplace over the past couple of years. Debt and equity capital has been relatively easy to find and commercial banks have been very willing participants as capital providers; however, many of the commercial banks have admitted that this robust marketplace

Read More »

JOIN OUR NEXT SERIES

Financial Leadership Workshop

MARCH 28TH-31ST 2022

THE ART OF THE CFO®

Financial Leadership Workshop

Days
Hours
Min

August 7-10th, 2023

SHARE THIS ARTICLE
WIKI CFO® - Browse hundreds of articles
Skip to content